subject
Mathematics, 18.10.2019 01:00 epmooneyham7372

Aproduction line has three machines a, b, and c, with reliabilities of .99, .96, and .93,respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line (i. e., a series backup), and plan 2 involves providing a backup for each machine (i. e., a parallel backup). in either case, three additional machines (a, b, and c) would be used with reliabilities equal to the original three.

a. which plan will provide higher reliability?
b. explain why the two reliabilities are not the same.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
Three baby penguins and their father were sitting on an iceberg 0.50.50, point, 5 meters above the surface of the water. the father dove down 4.74.74, point, 7 meters from the iceberg into the water to catch dinner for his kids. what is the father penguin's position relative to the surface of the water?
Answers: 2
question
Mathematics, 21.06.2019 20:30
Find the nonpermissible replacement for binthis expression.b2/5b +5
Answers: 1
question
Mathematics, 21.06.2019 21:30
What percent of 18 is 24? and plz explain thx.
Answers: 2
question
Mathematics, 22.06.2019 02:00
What ratio is proportional to 18/21
Answers: 1
You know the right answer?
Aproduction line has three machines a, b, and c, with reliabilities of .99, .96, and .93,respectivel...
Questions
question
English, 29.01.2021 02:20
question
Mathematics, 29.01.2021 02:20
Questions on the website: 13722359