subject
Mathematics, 19.10.2019 21:10 alexussaniyah

Machine a produces 156 toys in 13 hours while machine b produces 90 toys in 7 hours. which rate is higher?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Draw a scaled copy of the circle using a scale factor of 2
Answers: 1
question
Mathematics, 21.06.2019 22:20
Line segment eg is partitioned by point f in the ratio 1: 1. point e is at e (0, 4), and point f is at (1, 3). what are the coordinates of point g? (−1, 5) (2, 2) (3, 1) (4, 0)
Answers: 2
question
Mathematics, 22.06.2019 00:40
‼️‼️‼️‼️‼️the pressure exerted on the walls of a container by a gas enclosed within it is directly proportional to the temperature of the gas. if the pressure is 6 pounds per square inch when the temperature is 440 f, find the pressure exerted when the temperature of the gas is 380°f. (show work)
Answers: 1
question
Mathematics, 22.06.2019 02:00
Were only 64 seats. the remaining 6 students had to travel in a separate van. the equation 2b + 6 = 70 represents the given scenario. what does b represent? the number of buses the number of vans the number of students who rode on each bus the total number of students going to the football game
Answers: 1
You know the right answer?
Machine a produces 156 toys in 13 hours while machine b produces 90 toys in 7 hours. which rate is h...
Questions
question
Mathematics, 08.12.2021 17:30
question
Physics, 08.12.2021 17:30
Questions on the website: 13722361