subject
Mathematics, 30.10.2019 04:31 ajames2182

Aproduction line is to be designed to assemble a product. the assembly of this product requires three tasks, one of which requires 0.3 minutes to complete, one of which requires 1.4 minutes to complete, and one of which requires 0.7 minutes to complete. what is the minimum possible cycle time of this assembly line? what is the maximum possible cycle time of this assembly line?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Julia is going for a walk through the neighborhood. what unit of measure is most appropriate to describe the distance she walks?
Answers: 1
question
Mathematics, 21.06.2019 16:00
Afurniture manufacturer produces chairs and sofas. each chair requires 10 yards of fabric, and each sofa requires 20 yards of fabric. the manufacturer has 300 yards of fabric available. to fulfill orders, the number of sofas must be at least twice the number of chairs. let x be the number of chairs and y the number of sofas. which inequalities are described in the problem? check all of the boxes that apply
Answers: 2
question
Mathematics, 21.06.2019 18:00
What are the coordinates of the midpoint of ab? ,1/2) /2,-1) ,-3/2) /2,-2)
Answers: 1
question
Mathematics, 21.06.2019 18:00
In triangle △abc, ∠abc=90°, bh is an altitude. find the missing lengths. ah=4 and hc=1, find bh.
Answers: 1
You know the right answer?
Aproduction line is to be designed to assemble a product. the assembly of this product requires thre...
Questions
question
Mathematics, 19.01.2021 06:40
question
Mathematics, 19.01.2021 06:40
question
Mathematics, 19.01.2021 06:40
Questions on the website: 13722361