During an eight-hour shift, the proportion of timey that a sheet-metal stamping machine is down for maintenance or repairs has a beta distribution with α = 1 and β = 2. that is

2(1−y) , 0 ≤ y ≤ 1,

f(y)

0, elsewhere.

the cost (in hundreds of dollars) of this downtime, due to lost production and cost of maintenance and repair, is given by c = 10 + 20y + 4y^2. find the mean and variance of c.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
On a piece of paper graph f(x)=5•(0.4)^x
Answers: 1
question
Mathematics, 21.06.2019 16:00
You paint a 1/2 of a wall in 1/4 hour. how long will it take you to paint one wall
Answers: 2
question
Mathematics, 21.06.2019 17:30
Lindsay used two points, (x,y; ) and (+2.82), to find the equation of the line, y = mx + b, that passes through the points. y2-y, first, she used the definition of slope and determined that the value of mis x, - . given this information, which expression must represent the value of b?
Answers: 2
question
Mathematics, 21.06.2019 18:00
What is the location of point g, which partitions the directed line segment from d to f into a 5: 4 ratio? –1 0 2 3
Answers: 1
You know the right answer?
During an eight-hour shift, the proportion of timey that a sheet-metal stamping machine is down for...
Questions
Questions on the website: 13722359