subject
Mathematics, 23.11.2019 05:31 tyneshiajones124

Following a severe snowstorm, ken and bettina reeves must clear their driveway and sidewalk. ken can clear the snow by himself in 2 hours, and bettina can clear the snow by herself in 5 hours. after bettina has been working for 1-hour, ken is able to join her. how much longer will it take them working together to remove the rest of the snow?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Turner's mom measured his room to see how long the wallpaper border needed to be. if two walls are 15 feet long and two walls are 12 feet long, how long should the strip of border be cut?
Answers: 1
question
Mathematics, 21.06.2019 19:00
Give me the equations of two lines that have the same slope but are not parallel.
Answers: 3
question
Mathematics, 21.06.2019 20:00
Someone answer asap for ! the boiling point of water at an elevation of 0 feet is 212 degrees fahrenheit (°f). for every 1,000 feet of increase in elevation, the boiling point of water decreases by about 2°f. which of the following represents this relationship if b is the boiling point of water at an elevation of e thousand feet? a. e = 2b - 212 b. b = 2e - 212 c. e = -2b + 212 d. b = -2e + 212
Answers: 1
question
Mathematics, 21.06.2019 21:00
Val and tony get paid per project. val is paid a project fee of $44 plus $12 per hour. tony is paid a project fee of $35 plus $15 per hour. write an expression to represent how much a company will pay to hire both to work the same number of hours on a project.
Answers: 1
You know the right answer?
Following a severe snowstorm, ken and bettina reeves must clear their driveway and sidewalk. ken can...
Questions
Questions on the website: 13722363