subject
Mathematics, 04.12.2019 02:31 sarinaneedshelp01

Apolymer is manufactured in a batch chemical process. viscosity measurements are normally made on each batch, and long experience with the process has indicated that the variability in the process is fairly stable with o 20. fifteen batch
viscosity measurements are given as follows:
724, 718, 776, 760, 745, 759, 795, 756, 742, 740, 761, 749, 739, 747, 742
a process change that involves switching the type of catalyst used in the process is made. following the process change, eight batch viscosity measurements are taken:
735, 775, 729, 755, 783, 760, 738, 780
assume that process variability is unaffected by the catalyst change. if the difference in mean batch viscosity is 10 or less, the manufacturer would like to detect it with a high probability.
(a) formulate and test an appropriate hypothesis using a 0.10. what are your conclusions? find the p-value.
(b) find a 9096 confidence interval on the difference in mean batch viscosity resulting from the process change.
(c) compare the results of parts (a) and (b) and discuss your findings.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
What is the solution of log2  (3x  -  7)  =  3? 4 5
Answers: 1
question
Mathematics, 21.06.2019 18:40
Ineed with number 6 , explain how to get 1978
Answers: 3
question
Mathematics, 22.06.2019 00:30
Which number can each term of the equation be multiplied by to eliminate the decimals before solving? 5.6j- 0.12=4+1.1j
Answers: 3
question
Mathematics, 22.06.2019 01:20
Describe how to determine the average rate of change between x = 4 and x = 6 for the function f(x) = 2x^3 + 4. include the average rate of change in your answer.
Answers: 3
You know the right answer?
Apolymer is manufactured in a batch chemical process. viscosity measurements are normally made on ea...
Questions
question
Mathematics, 24.04.2021 01:00
question
Mathematics, 24.04.2021 01:00
question
Mathematics, 24.04.2021 01:00
Questions on the website: 13722367