Aconstruction company now wants to build a 100 meter high tower as quickly as possible. the company has unlimited resources and an unlimited budget and is willing to spend any amount to get the job done.

the tower is to be built with blocks that are 5 meters long and 1 meters wide, but only 1 meter tall. the blocks interlock on top and bottom (like legos).

they cannot be stacked sideways. using special lifters, putting one stack on top of another stack takes one week regardless of how high the stacks are.

what is the shortest amount of time that it will take to build the tower?


Aconstruction company now wants to build a 100 meter high tower as quickly as possible. the company

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Ifigured out the question and i dont know what to put here
Answers: 3
question
Mathematics, 21.06.2019 21:30
Can someone explain to me how to do
Answers: 1
question
Mathematics, 22.06.2019 02:40
Point a (7,3) is translated to a'(16,-9). which rule describes the translation?
Answers: 1
question
Mathematics, 22.06.2019 05:30
You're on a residential construction team doing roofing. the pitch of a roof is 13 rise over run. find the rise if the horizontal run of the roof is 15 feet 34 inches.
Answers: 2
You know the right answer?
Aconstruction company now wants to build a 100 meter high tower as quickly as possible. the company...
Questions
question
Computers and Technology, 30.11.2020 22:30
question
Mathematics, 30.11.2020 22:30
question
English, 30.11.2020 22:30
question
Chemistry, 30.11.2020 22:30
Questions on the website: 13722360