Aproject analyzed using pert has an expected completion time of 65 days and a variance of completion time equal to 16 days. (a) what is the probability of completing the project within 60 days? (b) what is the probability of completing the project within 72 days? (c) what is the completion time that yields a 99.0% chance of completion?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Acompany manufactures large valves, packed in boxes. a shipment consists of 1500 valves packed in 75 boxes. each box has the outer dimensions 1.2 x 0.8 x 1.6 m and the inner dimensions 1.19 x 0.79 x 1.59 m. the boxes are loaded on a vehicle (truck + trailer). the available capacity in the vehicle combination is 140 m3. each valve has a volume of 0.06 m3. - calculate the load factor on the box level (%). - calculate the load factor on the vehicle level (%). - calculate the overall load factor (%).
Answers: 1
question
Mathematics, 21.06.2019 22:30
The moats separating people from the animals are 5 m wide for lions and 4 m wide for the elephants. if the lion’s moat is 4 m deep, how deep should the elephants’ moat be?
Answers: 1
question
Mathematics, 22.06.2019 03:50
Jane is cooking beans and rice for dinner tonight. she has 4 cans of black beans, 6 cans of red beans, and 3 cans of garbanzo beans in her cupboard. if she grabs a can of beans without looking at the label, what is the probability of her making black beans and rice for dinner?
Answers: 2
question
Mathematics, 22.06.2019 04:00
Equal rights is what a. equlaity b. standards c. sovereignty d. minority rights
Answers: 1
You know the right answer?
Aproject analyzed using pert has an expected completion time of 65 days and a variance of completion...
Questions
question
Mathematics, 30.07.2019 18:50
Questions on the website: 13722367