Suppose that a project manager tested the strength of one tile out of a batch of 3,000 to be used on a building. this one sample measurement was compared with the design specification and, in this case, the sampled tile's strength exceeded that of the specification. on this basis, the project manager accepted the tile shipment. if the sampled tile was defective (with a strength less than the specification), the project manager would have rejected the lot. a. what is the probability that ninety percent of the tiles are substandard, even though the project manager's sample gave a satisfactory result? b. sketch out the operating characteristic curve for this sampling plan as a function of the actual fraction of defective tiles.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Find the quotient. 50a2 – 98b2 -5a +7b
Answers: 1
question
Mathematics, 21.06.2019 18:30
Can someone check if i did this right since i really want to make sure it’s correct. if you do you so much
Answers: 2
question
Mathematics, 21.06.2019 21:40
Drag the tiles to the correct boxes to complete the pairs. using the properties of integer exponents, match each expression with the correct equivalent expression.
Answers: 1
question
Mathematics, 22.06.2019 01:10
A3cmΓ—3cm\greend{3\,\text{cm} \times 3\,\text{cm}} 3cmΓ—3cm start color greend, 3, space, c, m, times, 3, space, c, m, end color greend rectangle sits inside a circle with radius of 4cm\blued{4\,\text{cm}} 4cm start color blued, 4, space, c, m, end color blued . what is the area of the shaded region? round your final answer to the nearest hundredth.
Answers: 3
You know the right answer?
Suppose that a project manager tested the strength of one tile out of a batch of 3,000 to be used on...
Questions
question
Mathematics, 05.11.2020 01:00
question
English, 05.11.2020 01:00
question
Spanish, 05.11.2020 01:00
question
Business, 05.11.2020 01:00
Questions on the website: 13722360