subject
Mathematics, 21.01.2020 22:31 ittmanny6138

Amanufacturer has designed a process to produce pipes that are 10 feet long. the distribution of the pipe length, however, is actually uniform on the interval 10 feet to 10.57 feet. assume that the lengths of individual pipes produced by the process are independent. let x and y represent the lengths of two different pipes produced by the process.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Asailor is looking at a kite. if he is looking at the kite at an angle of elevation of 36and the distance from the boat to the point where the kite is directly overhead is 40 feet, how high is the kite?
Answers: 1
question
Mathematics, 21.06.2019 17:30
Which is the equation of a line perpendicular to the line with the equation 3x+4y=8
Answers: 1
question
Mathematics, 21.06.2019 18:30
What is the prime factorization of 23 ?me with this question
Answers: 1
question
Mathematics, 21.06.2019 21:40
Atransformation t : (x,y) (x-5,y +3) the image of a(2,-1) is
Answers: 1
You know the right answer?
Amanufacturer has designed a process to produce pipes that are 10 feet long. the distribution of the...
Questions
question
Biology, 08.12.2020 21:10
question
Biology, 08.12.2020 21:10
question
Mathematics, 08.12.2020 21:10
question
Mathematics, 08.12.2020 21:10
Questions on the website: 13722360