subject
Mathematics, 11.02.2020 22:45 Lianabel0517

You report to your supervisor the average length of chain produced per operating hour each
week. The equipment operates 5 days a week for 12 hours each day. According to last week's
production numbers shown in the table, how many feet of chain were produced per
operating hour?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Suppose a pendulum is l meters long. the time,t,in seconds that it tales to swing back and forth once is given by t=2.01
Answers: 1
question
Mathematics, 21.06.2019 19:20
Thompson and thompson is a steel bolts manufacturing company. their current steel bolts have a mean diameter of 127 millimeters, and a variance of 36. if a random sample of 35 steel bolts is selected, what is the probability that the sample mean would differ from the population mean by greater than 0.5 millimeters? round your answer to four decimal places.
Answers: 3
question
Mathematics, 21.06.2019 22:40
What is the value of p in the equation y^ = -4x?
Answers: 1
question
Mathematics, 21.06.2019 23:30
Choose the correct translation for the following statement. it is at most ten. x< 10 x< 10 x> 10 x> 10
Answers: 1
You know the right answer?
You report to your supervisor the average length of chain produced per operating hour each
wee...
Questions
question
Mathematics, 20.09.2020 02:01
question
Mathematics, 20.09.2020 02:01
Questions on the website: 13722362