subject
Mathematics, 12.02.2020 00:38 starajaclark1429

It has just been learned that a Boeing 747 transporting garments made in China crashed in the Pacific Ocean during its flight to Los Angeles. Although the crew was saved, all cargo was lost, including 3000 garments that must be delivered in one week. The garment company must produce the order at its Los Angeles plant to satisfy delivery obligations. The number of workers must be determined and workspace must be allocated in the plant for this emer gency job. Standard time to produce one garment is 6.50 min. The garments are then 100 inspected at a standard time of 0.75 min per unit. The scrap rate in production is 7%. However, all defective garments can be corrected through rework. Standard time for tework is 5.0 min per unit reworked. It is not necessary to reinspect the garments after rework. Worker eff- ciency is 120% during production and 100% during inspection and rework. The same pro duction workers do the rework, but inspectors are a different job class. How many workers and how many inspectors are required to produce the required batch of 3000 garments in the regular 40-hour work week?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Plzzzzzzzzzzzzzzzzzzzzzzzzz will give brainliest
Answers: 2
question
Mathematics, 21.06.2019 19:30
Is the figure congruent? yes or no?
Answers: 1
question
Mathematics, 21.06.2019 19:30
Aregular pentagon with a perimeter of 21 inches is dilated by a scale factor of 5/3 to create a new pentagon. what is the perimeter of the new pentagon?
Answers: 2
question
Mathematics, 21.06.2019 22:00
Using inductive reasoning, what are the next two number in this set? 2,3/2,4/3,5/4,
Answers: 1
You know the right answer?
It has just been learned that a Boeing 747 transporting garments made in China crashed in the Pacifi...
Questions
question
Arts, 19.11.2020 04:40
question
Mathematics, 19.11.2020 04:40
question
Spanish, 19.11.2020 04:40
Questions on the website: 13722367