Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 23:30
Hich equation can pair with x + 2y = 5 to create an inconsistent system? 2x + 4y = 3 5x + 2y = 3 6x + 12y = 30 3x + 4y = 8
Answers: 3
Mathematics, 22.06.2019 01:30
Atransformation was performed on rectangle c as shown in the graph. what type of transformation was performed? does that transformation result in congruent shapes? you people
Answers: 1
Mathematics, 22.06.2019 02:50
Atourist boat is used for sightseeing in a nearby river. the boat travels 2.4 miles downstream and in the same amount of time, it travels 1.8 miles upstream. if the boat travels at an average speed of 21 miles per hour in the still water, find the current of the river.
Answers: 2
Factor the expression -24x + 16y - 4....
Mathematics, 06.03.2021 01:00
Mathematics, 06.03.2021 01:00
Mathematics, 06.03.2021 01:00
Mathematics, 06.03.2021 01:00
Advanced Placement (AP), 06.03.2021 01:00
Mathematics, 06.03.2021 01:00
Mathematics, 06.03.2021 01:00