subject
Mathematics, 21.02.2020 19:45 samaragreen34

(30 pts) The total construction cost of a sewage treatment plant with a capacity of 50 million gallons per day completed 2013 in Wichita, Kansas was $6.5 million. It was proposed that a similar treatment plant with a capacity of 80 million gallons per day be built in Los Angles, California, for completion in 2020. For the additional information given below, perform an order of magnitude estimate of the cost of the proposed plant using the following steps in order (a) to (f): a. In the total construction cost for the Wichita, Kansas plant, there was an item of $0.5 million for site preparation which is not typical for similar plants. b. The variation of sizes of the refineries can be approximated by the cost-capacity factor with m

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Find an equation of the line perpendicular to the graph.
Answers: 3
question
Mathematics, 21.06.2019 17:00
Find the measure of the interior angles of the following regular polygons: a triangle, a quadrilateral, a pentagon, an octagon, a decagon, a 30-gon, a 50-gon, and a 100-gon.
Answers: 1
question
Mathematics, 21.06.2019 17:30
Solve the equation - 2(m -30) = -6m a-15 b-13 c-8 d8
Answers: 1
question
Mathematics, 21.06.2019 18:30
If you have the following equation, 2/3x+5/6-x=2-3/4x what would you multiply each term by to get rid of all the fractions
Answers: 3
You know the right answer?
(30 pts) The total construction cost of a sewage treatment plant with a capacity of 50 million gallo...
Questions
Questions on the website: 13722367