subject
Mathematics, 24.02.2020 16:36 meth77

In the manufacturing of a chemical adhesive, 9% of all batches have raw materials from two different lots. This occurs when holding tanks are replenished and the remaining portion of a lot is insufficient to fill the tanks. Only 5% of batches with material from a single lot require reprocessing. However, the viscosity of batches consisting of two or more lots of material is more difficult to control, and 40% of such batches require additional processing to achieve the required viscosity. Let A denote the event that a batch is formed from two different lots, and let B denote the event that a lot requires additional processing. Determine the following probabilities.
a. P(A)
b. P(A')
c. P(B\A)
d. P(B\A')
e. P(A ∩ B)
f. P(A ∩ B')
g. P(B)

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Solve the following inequalities and show the solution on a number line. 3/4 (2x-7) ≤ 5
Answers: 1
question
Mathematics, 21.06.2019 20:20
Abag contains 3 red marbles, 2 blue marbles, and 2 green marbles. one marble is picked, then another marble. assume that the selections are made with replacement. a) find the probability of picking two red marbles with replacement. b) find the probability of picking a red marble and a blue marble. assume the selections are made without replacement. c) find the probability of picking two red marbles without replacement. d) find the probability of picking a red marble and a blue marble without replacement.
Answers: 1
question
Mathematics, 21.06.2019 20:30
Which shows the graph of the solution set of 3y – 2x > –18?
Answers: 1
question
Mathematics, 21.06.2019 20:30
Need asap. solve for the following inequality
Answers: 1
You know the right answer?
In the manufacturing of a chemical adhesive, 9% of all batches have raw materials from two different...
Questions
question
Advanced Placement (AP), 27.11.2019 23:31
Questions on the website: 13722363