subject
Mathematics, 24.02.2020 17:48 rainbowmc6

A 3000-lb wrecking ball hangs from a 10-ft cable of density 10 lb/ft attached to a crane. Calculate the work done if the crane lifts the ball from ground level to 10 ft in the air by drawing in the cable.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Ricardo ran the 400 meter race 3 times his fastest time was 54.3 seconds his slowest time was 56.1 seconds if his average time was 55.0 seconds what was his time for the third race
Answers: 2
question
Mathematics, 21.06.2019 15:00
This is the number of parts out of 100, the numerator of a fraction where the denominator is 100. submit
Answers: 3
question
Mathematics, 21.06.2019 15:30
The appalachian trail is a hiking trail that passes through the appalachian mountains. three members of a teen hiking group hiked a section of the trail. the hikers stopped at a rest area and equally shared 3 4 gallon of water. how much water did each person get?
Answers: 1
question
Mathematics, 21.06.2019 20:30
Solve the triangle. a = 21°, c = 105°, c = 5
Answers: 2
You know the right answer?
A 3000-lb wrecking ball hangs from a 10-ft cable of density 10 lb/ft attached to a crane. Calculate...
Questions
question
Mathematics, 26.06.2019 23:00
question
Chemistry, 26.06.2019 23:00
Questions on the website: 13722361