subject
Mathematics, 25.02.2020 21:54 AniyahM17

It takes about 14 person-hours of labor to break up a driveway and clear away the rubble. It tajes about 8 person-hours of labor to pour and smooth concrete for the new driveway. About how many person-hours of labor does it take to break up a driveway, clear away rubble pour the concrete and smooth the concrete?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:20
Mr. walker gave his class the function f(x) = (x + 3)(x + 5). four students made a claim about the function. each student’s claim is below. jeremiah: the y-intercept is at (15, 0). lindsay: the x-intercepts are at (–3, 0) and (5, 0). stephen: the vertex is at (–4, –1). alexis: the midpoint between the x-intercepts is at (4, 0). which student’s claim about the function is correct?
Answers: 2
question
Mathematics, 21.06.2019 18:00
John read the first 114 pages of a novel, which was 3 pages less than 1/3 of the novel. write an equation to determine the total number of pages (p)(p) in the novel.
Answers: 1
question
Mathematics, 21.06.2019 18:50
The circumference of a redwood tree trunk is 20π ft, and it is 100 ft tall. what is the approximate volume of the redwood tree trunk? 1,000π ft3 10,000π ft3 4,000π ft3 40,000π ft3
Answers: 1
question
Mathematics, 22.06.2019 00:50
Acube has a volume of 800 cubic inches. whatis the length of an edge of the cube, in inches? a. 23/100b. 43/50c. 83/100d. 1003/2e. 1003/8
Answers: 2
You know the right answer?
It takes about 14 person-hours of labor to break up a driveway and clear away the rubble. It tajes a...
Questions
question
Mathematics, 13.05.2021 20:20
question
Mathematics, 13.05.2021 20:20
question
Social Studies, 13.05.2021 20:20
Questions on the website: 13722363