subject
Mathematics, 27.02.2020 18:46 iBrain

The Hit-and-Miss Manufacturing Company produces items that have a probability p of being defective. These items are produced in lots of 150. Past experience indicates that p for an entire lot is either 0.05 or 0.25. Furthermore, in 90 percent of the lots produced, p equals 0.05 (so p equals 0.25 in 10 percent of the lots). These items are then used in an assembly and ultimately their quality is determined before the final assembly leaves the plant. Initially the company can either screen each item in a lot at a cost of $10 per item and replace defective items or use the items directly without screening. If the latter action is chosen, the cost of rework is ultimately $100 per defective item. Because screening requires scheduling of inspectors and equipment, the decision to screen or not screen must be made 2 days before the screening is to take place. However, one item can be taken from the lot and sent to a laboratory for inspection, and its quality (defective or nondefective) can be reported before the screen/no screen decision must be made. The cost of this initial inspection is $20 (a) Find the optimal policy that minimizes the expected cost of manufacturing (b) Compute EVPI (c) Compute EVE

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 21:00
Need match the functions with correct transformation. f(x) = -3x f(x) = |x-1|+3 f(x) = √(x+3) 1/2x² f(x) = (x+1)²-3 4|x| 1. compress by a factor of 1/2 2. stretch by a factor of 4 3. shift to the left 3 4. shift to the left 1 5. shift up 3 6. reflection
Answers: 1
question
Mathematics, 21.06.2019 21:30
The measures of the legs of a right triangle are 15m and 20m . what is the length of the hypotenuse
Answers: 1
question
Mathematics, 22.06.2019 00:30
How do i i solve this equation? -18 = x/3 + 3
Answers: 1
question
Mathematics, 22.06.2019 01:30
Here are the 30 best lifetime baseball batting averages of all time, arranged in order from lowest to highest: 0.319, 0.329, 0.330, 0.331, 0.331, 0.333, 0.333, 0.333, 0.334, 0.334, 0.334, 0.336, 0.337, 0.338, 0.338, 0.338, 0.340, 0.340, 0.341, 0.341, 0.342, 0.342, 0.342, 0.344, 0.344, 0.345, 0.346, 0.349, 0.358, 0.366 if you were to build a histogram of these data, which of the following would be the best choice of classes?
Answers: 3
You know the right answer?
The Hit-and-Miss Manufacturing Company produces items that have a probability p of being defective....
Questions
question
Physics, 05.05.2020 04:35
question
Mathematics, 05.05.2020 04:35
question
History, 05.05.2020 04:35
question
Mathematics, 05.05.2020 04:35
Questions on the website: 13722367