subject
Mathematics, 02.03.2020 02:57 genyjoannerubiera

Find the value of x.
m<2 = x + 120


Find the value of x.m<2 = x + 120

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Consider the function represented by the equation 1/2 j + 1/4 k equals 3 which shows the equation written in function notation with j as the independent variable
Answers: 1
question
Mathematics, 21.06.2019 18:30
The table shows the relationship between the number of cups of cereal and the number of cups of raisins in a cereal bar recipe: number of cups of cereal number of cups of raisins 8 2 12 3 16 4 molly plotted an equivalent ratio as shown on the grid below: a graph is shown. the title of the graph is cereal bars. the horizontal axis label is cereal in cups. the x-axis values are 0, 20, 40, 60, 80,100. the vertical axis label is raisins in cups. the y-axis values are 0, 10, 20, 30, 40, 50. a point is plotted on the ordered pair 40,20. which of these explains why the point molly plotted is incorrect? (a) if the number of cups of cereal is 40, then the number of cups of raisins will be10. (b)if the number of cups of raisins is 40, then the number of cups of cereal will be10. (c) if the number of cups of cereal is 40, then the number of cups of raisins will be 80. (d) if the number of cups of raisins is 40, then the number of cups of cereal will be 80.
Answers: 1
question
Mathematics, 21.06.2019 19:20
Part a: sam rented a boat at $225 for 2 days. if he rents the same boat for 5 days, he has to pay a total rent of $480. write an equation in the standard form to represent the total rent (y) that sam has to pay for renting the boat for x days. (4 points)
Answers: 1
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
Find the value of x.
m<2 = x + 120

...
Questions
question
Mathematics, 03.08.2019 19:00
Questions on the website: 13722362