subject
Mathematics, 03.03.2020 02:59 thajaalalqo

An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. a. What are the minimum and maximum cycle times

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
In the proof of the triangle angle sum theorem, you must draw an auxiliary line. which construction must you use to draw this line?
Answers: 3
question
Mathematics, 21.06.2019 14:00
In the diagram, the measure of angle 9 is 85° which angle must also measure 85°?
Answers: 3
question
Mathematics, 21.06.2019 17:30
How many bananas are in a fruit bowl that has 200 total apples and bananas if there are 31 bananas for every 93 apples
Answers: 1
question
Mathematics, 21.06.2019 19:30
Factor the following expression. 27y3 – 343 a. (3y + 7)(9y2 + 2ly + 49) b. (3y – 7)(9y2 + 2ly + 49) c. (3y – 7)(932 – 217 + 49) d. (3y + 7)(92 – 2ly + 49)
Answers: 1
You know the right answer?
An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total tim...
Questions
question
Mathematics, 11.03.2021 02:00
question
Biology, 11.03.2021 02:00
Questions on the website: 13722360