subject
Mathematics, 06.03.2020 19:53 tot92

Universal pet house sells vinyl doghouses and treated lumber doghouses. It takes the company 5 hours to build a vinyl doghouse and 2 hours to build a treated lumber doghouse. The company dedicates 50 hours every week towards building doghouses. It takes an additional hour to paint each vinyl doghouses and an additional 2 hours to assemble each treated lumber doghouse. The company dedicates 30 hours every week towards assembling and painting doghouse.
Write a system of equation that represent the production time needed to build each doghouse and the production time needed for painting and assembling each dog house. Use X to represent the number of vinyl doghouses and Y to represent the number of treated lumber doghouses

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 22.06.2019 01:30
One side of a rectangle is 7 centimeters shorter than six times the other side. find the length of the longer side if we also know that the perimeter of the rectangle is 266 centimeters.
Answers: 2
question
Mathematics, 22.06.2019 03:30
Can someone tell me if these are correct?
Answers: 2
question
Mathematics, 22.06.2019 03:50
A11 gram sample of a substance that’s used to treat thyroid disorders has a k-value of 0.1247
Answers: 1
question
Mathematics, 22.06.2019 05:00
There are 1872 steps in a building that has 104 floors. each floor has the same number of steps. a second building has the same number of floors but 2 fewer steps between each floor. how many steps are there between each floor of the second building?
Answers: 3
You know the right answer?
Universal pet house sells vinyl doghouses and treated lumber doghouses. It takes the company 5 hours...
Questions
question
Mathematics, 06.11.2020 19:30
question
Mathematics, 06.11.2020 19:30
question
English, 06.11.2020 19:30
question
History, 06.11.2020 19:30
Questions on the website: 13722361