subject
Mathematics, 06.03.2020 23:44 queendolly

Suppose a risk neutral principal wants to hire an agent to do a project. The output .Y is either 1 (if successes) or 0 (if not). The probability of success depends on the agent's effort e Ξ΅ [0, 1].
i. e., Pr(X = 1) = e.
The cost of effort is c(e) = 1/2e^2. Because the principal cannot directly observe e, he will write a contract on the outcome X, i. e., the principal pays the agent w_1 if it succeeds, and w_0 = 0 otherwise. The agent's monetary utility is u(w) = 3 w^1/3. The agent's outside reservation utility is assumed to be zero.
1. What's the first best effort level and contract?
2. Derive the optimal contract under moral hazard.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 23:50
Apolynomial has two terms. check all of the factoring methods that should be considered. common factor difference of cubes sum of cubes difference of squares perfect-square trinomial factoring by grouping
Answers: 3
question
Mathematics, 22.06.2019 00:30
Long division setup showing an incomplete calculation. 12 is in the divisor, 6839 is in the dividend, and 5 hundreds and 6 tens is written in the quotient. 6000 is subtracted from 6839 to give 839. an unknown value represented by a box is being subtracted from 839. what number should be placed in the box to complete the division calculation?
Answers: 3
question
Mathematics, 22.06.2019 02:00
If two points are given,then exactly one line can be drawn through those two points.which geometry term does the statement represent
Answers: 2
question
Mathematics, 22.06.2019 03:00
Has a picture and need within 5 min
Answers: 2
You know the right answer?
Suppose a risk neutral principal wants to hire an agent to do a project. The output .Y is either 1 (...
Questions
question
Mathematics, 27.07.2019 04:30
Questions on the website: 13722360