subject
Mathematics, 10.03.2020 03:00 selenamr

A methods and measurements analyst needs to develop a time standard for a certain task. In a preliminary study, he observed one of his workers perform this task five times, with the following results:

Observation 1 2 3 4 5
Time 84 76 80 84 76

What is the standard time for this task if the employee worked at a 25 percent faster pace than average and an allowance of 20 percent of the workday is used?

a. 80 seconds
b. 96 seconds
c. 125 seconds

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
What is the volume of a rectangular prism that is 120 centimeters by 2 meters by 1.5 meters in cubic meters?
Answers: 1
question
Mathematics, 21.06.2019 17:00
Suppose i flip two identical coins. what is the probability that i get one head and one tail?
Answers: 2
question
Mathematics, 21.06.2019 23:30
Astraight water slide is 175 feet above ground and is 200 feet long. what is the angle of depression to the bottom of the slide?
Answers: 1
question
Mathematics, 21.06.2019 23:30
In the diagram, ab is tangent to c, ab = 4 inches, and ad = 2 inches. find the radius of the circle.
Answers: 1
You know the right answer?
A methods and measurements analyst needs to develop a time standard for a certain task. In a prelimi...
Questions
question
Social Studies, 20.12.2019 07:31
question
Mathematics, 20.12.2019 07:31
question
Chemistry, 20.12.2019 07:31
Questions on the website: 13722361