Process control is nothing more or less than monitoring quality as the work is being performed. Perhaps the most widely adopted approach to process control is the use of control charts. Control charts can be developed and used to manage both characteristics (X-bar charts) and attributes (p-charts). Further, control charts can and should be used throughout the value-added process; that is, in purchasing, production, and logistics operations. Similarly, control charts can be used to improve quality in both manufacturing and service environments.
Three types of information must be available to set up a control chart. These are 1) a desired target, 2) a measure of variability around the target, and 3) a managerial assessment of required quality level. The target generally takes the form of a mean or average; the variability is usually measured via a variance (standard deviation); and the assessment of required quality level is expressed using a z-score. It is important to remember that the measure of variability be expressed in terms consistent with the "items" being plotted on the control chart--this usually requires that a standard deviation be transformed into a standard error. When using a control chart, the process operator looks for occurrences when the process is out of control (exceeds control limits) or when "bad" trends emerge. Over time, the causes of these occurrences can be identified and eliminated such that the process is improved continually. Finally, remember that the process must be in control when the control chart is set up (otherwise GIGO!).
For the following process, answer the following questions.
1. What is the grand mean or target?
2. What is the standard deviation?
3. What is the standard error?
4. With a Z-score of 3, what are the upper and lower limits?

Twenty samples of four items each were taken to set up the control chart. The design target = 2.80 cm.

Sample Measures within the Sample
1 2.81 2.79 2.78 2.80
2 2.81 2.79 2.80 2.83
3 2.79 2.77 2.80 2.81
4 2.81 2.78 2.79 2.81
5 2.82 2.79 2.80 2.78
6 2.78 2.79 2.82 2.80
7 2.80 2.80 2.81 2.79
8 2.79 2.80 2.80 2.82
9 2.78 2.78 2.81 2.80
10 2.81 2.79 2.80 2.81
11 2.78 2.82 2.79 2.80
12 2.80 2.82 2.81 2.79
13 2.78 2.79 2.78 2.81
14 2.81 2.82 2.80 2.79
15 2.78 2.82 2.81 2.79
16 2.79 2.80 2.79 2.82
17 2.80 2.81 2.80 2.78
18 2.80 2.80 2.79 2.82
19 2.78 2.82 2.79 2.79
20 2.77 2.81 2.82 2.80

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Name each raycalculation tip: in ray "ab", a is the endpoint of the ray.
Answers: 2
question
Mathematics, 21.06.2019 19:00
What is the volume of a cone with a height of 6 cm in the radius of 2 cm
Answers: 1
question
Mathematics, 22.06.2019 02:20
Use the second shift theorem to find the inverse laplace transform of (e^−3s) / (s^2 + 2s − 3)
Answers: 1
question
Mathematics, 22.06.2019 04:30
Jocelyn estimates that a piece of wood measures 5.5 cm. if it actually measures 5.62 cm, what is the percent error of jocelyn’s estimate? a. 2.13% b. 2.18% c. 12% d. 46.83%
Answers: 1
You know the right answer?
Process control is nothing more or less than monitoring quality as the work is being performed. Perh...
Questions
question
Computers and Technology, 30.10.2020 22:00
question
Mathematics, 30.10.2020 22:00
Questions on the website: 13722360