Mathematics, 11.03.2020 04:34 blachaze8729
A production facility contains two machines that are used to reworkitems that are initially defective.
LetXbe the number of hours that the firstmachine is in use, and letYbe the number of hours that the second machine isin use, on a randomly chosen day.
Assume that X and Y have joint probabilitydensity function given by, f(x, y) ={32(x2+y2)0< x <1 and 0< y <10 otherwise
What is the probability that both machines are in operation for more than half an hour?
Answers: 1
Mathematics, 21.06.2019 17:30
How do i make someone brainliest? (if you answer me, i might be able to make you brainliest! )
Answers: 1
Mathematics, 21.06.2019 18:00
The chs baseball team was on the field and the batter popped the ball up. the equation b(t)=80t-16•16+3.5 represents the height of the ball above the ground in feet as a function of time in seconds. how long will the catcher have to get in position to catch the ball before it hits the ground? round to the nearest second
Answers: 3
Mathematics, 21.06.2019 20:30
Find the solution(s) to the system of equations. select all that apply y=x^2-1 y=2x-2
Answers: 2
A production facility contains two machines that are used to reworkitems that are initially defectiv...
History, 09.09.2020 14:01
History, 09.09.2020 14:01
Mathematics, 09.09.2020 14:01
Mathematics, 09.09.2020 14:01
Mathematics, 09.09.2020 14:01
Mathematics, 09.09.2020 14:01
Mathematics, 09.09.2020 14:01
Mathematics, 09.09.2020 14:01
Mathematics, 09.09.2020 14:01
Mathematics, 09.09.2020 14:01
Social Studies, 09.09.2020 14:01
Mathematics, 09.09.2020 14:01
Mathematics, 09.09.2020 14:01
Social Studies, 09.09.2020 14:01
English, 09.09.2020 14:01
Mathematics, 09.09.2020 14:01