subject
Mathematics, 12.03.2020 05:29 XynonAdat

A machine makes two components; call them types A and B. It takes 250 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components into 1 unit every 2 seconds, or 30 units per minute.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
The contents of 3838 cans of coke have a mean of xĀÆĀÆĀÆ=12.15xĀÆ=12.15. assume the contents of cans of coke have a normal distribution with standard deviation of Ļƒ=0.12.Ļƒ=0.12. find the value of the test statistic zz for the claim that the population mean is Ī¼=12.Ī¼=12.
Answers: 1
question
Mathematics, 21.06.2019 19:30
Weekly wages at a certain factory are normally distributed with a mean of $400 and a standard deviation of $50. find the probability that a worker selected at random makes between $450 and $500
Answers: 2
question
Mathematics, 21.06.2019 22:30
Aaron invested a total of $4,100, some in an account earning 8% simple interest, and the rest in an account earning 5% simple interest. how much did he invest in each account if after one year he earned $211 in interest? select one: a. $200 at 8%, $3,900 at 5% b. $3,200 at 8%, $900 at 5% c. $900 at 8%, $3,200 at 5% d. $3,900 at 8%, $200 at 5%
Answers: 1
question
Mathematics, 21.06.2019 23:30
Which function represents the sequence? f(n)=n+3 f(n)=7nāˆ’4 f(n)=3n+7 f(n)=n+7
Answers: 1
You know the right answer?
A machine makes two components; call them types A and B. It takes 250 seconds to switch production b...
Questions
question
Spanish, 19.11.2020 20:10
question
English, 19.11.2020 20:10
question
Physics, 19.11.2020 20:10
Questions on the website: 13722361