Mathematics, 23.03.2020 13:14 Trinityslater
A manufacturing firm makes a production run of 3,750 pieces. Each piece is 78.30 millimeters long. The cost of material per meter of length is $2.40. Allowing 10% for waste and scrap, what is the material cost for the 3,750 pieces? Round to nearest dollar.
Answers: 2
Mathematics, 21.06.2019 15:30
Mary used 1/7 of a spool of ribbon to complete 4 projects. she used the same amount of ribbon on each project. how much ribbon did she use on each project?
Answers: 2
Mathematics, 21.06.2019 17:10
The number of chocolate chips in an 18-ounce bag of chocolate chip cookies is approximately normally distributed with a mean of 1252 chips and standard deviation 129 chips. (a) what is the probability that a randomly selected bag contains between 1100 and 1500 chocolate chips, inclusive? (b) what is the probability that a randomly selected bag contains fewer than 1125 chocolate chips? (c) what proportion of bags contains more than 1225 chocolate chips? (d) what is the percentile rank of a bag that contains 1425 chocolate chips?
Answers: 1
Mathematics, 21.06.2019 20:30
Cody was 165cm tall on the first day of school this year, which was 10% taller than he was on the first day of school last year.
Answers: 1
A manufacturing firm makes a production run of 3,750 pieces. Each piece is 78.30 millimeters long. T...
Biology, 30.10.2020 22:00
English, 30.10.2020 22:00
Mathematics, 30.10.2020 22:00
Mathematics, 30.10.2020 22:00
English, 30.10.2020 22:00
Mathematics, 30.10.2020 22:00
Biology, 30.10.2020 22:00
Mathematics, 30.10.2020 22:00
Computers and Technology, 30.10.2020 22:00
Biology, 30.10.2020 22:00
Mathematics, 30.10.2020 22:00
English, 30.10.2020 22:00