AE Manufacturing has 60 machine hours every day. AE Manufacturing two products, A and B. When changing over from producing product B to A, there is no change over time. When changing over from producing product A to B, it takes 8 machine hours. If the previous day ended with producing product B, what is the effective capacity when AE Manufacturing has the following schedule: product A, product B, product A.

56 machine hours per day

60 machine hours per day

44 machine hours per day

52 machine hours per day

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Bismuth-210 is an isotope that radioactively decays by about 13% each day, meaning 13% of the remaining bismuth-210 transforms into another atom (polonium-210 in this case) each day. if you begin with 233 mg of bismuth-210, how much remains after 8 days?
Answers: 3
question
Mathematics, 21.06.2019 20:30
What is always true about a positive integer raised to a negative odd power?
Answers: 1
question
Mathematics, 21.06.2019 22:20
Which graph represents the given linear function 4x+2y=3
Answers: 1
question
Mathematics, 21.06.2019 23:30
In the diagram, ab is tangent to c, ab = 4 inches, and ad = 2 inches. find the radius of the circle.
Answers: 3
You know the right answer?
AE Manufacturing has 60 machine hours every day. AE Manufacturing two products, A and B. When changi...
Questions
question
English, 29.11.2021 21:40
question
Biology, 29.11.2021 21:40
question
History, 29.11.2021 21:40
Questions on the website: 13722367