subject
Mathematics, 25.03.2020 23:56 LoneWolves

The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the makespan to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are as follows: Car Body Work (hrs) Paint (hrs) A 10 2 B 5 4 C 7 5 D 3 6 E 1 7 What is the optimum sequence (first car to last)?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Explain why the two figures below are not similar. use complete sentences and provide evidence to support your explanation. (10 points) figure abcdef is shown. a is at negative 4, negative 2. b is at negative 3, 0. c is at negative 4, 2. d is at negative 1, 2. e
Answers: 3
question
Mathematics, 21.06.2019 21:10
Plot a point at the y-intercept of the following function on the provided graph. 3y=-5x+7 20 points
Answers: 1
question
Mathematics, 21.06.2019 23:00
Answer this two poles, ab and ed, are fixed to the ground with the of ropes ac and ec, as shown: two right triangles abc and edc have a common vertex c. angle abc and edc are right angles. ab is labeled 13 feet, ac is labeled 15 feet, ec is labeled 10 feet, and ed is labeled 4 feet.what is the approximate distance, in feet, between the two poles? 11.14 feet16.65 feet14.35 feet15.59 feet
Answers: 1
question
Mathematics, 21.06.2019 23:00
Afamily went out to dinner and their bill was $113.if they want to leave a 19% tip, how much should they leave.
Answers: 2
You know the right answer?
The operations manager of a body and paint shop has five cars to schedule for repair. He would like...
Questions
question
Mathematics, 25.09.2020 02:01
question
Geography, 25.09.2020 02:01
question
English, 25.09.2020 02:01
question
Mathematics, 25.09.2020 02:01
question
Mathematics, 25.09.2020 02:01
question
Mathematics, 25.09.2020 02:01
Questions on the website: 13722361