A given project’s expected duration along its critical path is 50 days, based on optimistic, most likely, and pessimistic duration estimates. What is the probability that the project will finish on or before 50 days?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
Browning labs is testing a new growth inhibitor for a certain type of bacteria. the bacteria naturally grows exponentially each hour at a rate of 6.2%. the researchers know that the inhibitor will make the growth rate of the bacteria less than or equal to its natural growth rate. the sample currently contains 100 bacteria.the container holding the sample can hold only 300 bacteria, after which the sample will no longer grow. however, the researchers are increasing the size of the container at a constant rate allowing the container to hold 100 more bacteria each hour. they would like to determine the possible number of bacteria in the container over time.create a system of inequalities to model the situation above, and use it to determine how many of the solutions are viable.
Answers: 1
question
Mathematics, 21.06.2019 20:20
One of every 20 customers reports poor customer service on your company’s customer satisfaction survey. you have just created a new process that should cut the number of poor customer service complaints in half. what percentage of customers would you expect to report poor service after this process is implemented? 1.) 5% 2.) 10% 3.) 2% 4.) 2.5%
Answers: 1
question
Mathematics, 21.06.2019 21:30
Mr. vector door is buying two new cowboy hats all together the hats cost $75.12 the second heart cost twice as much as the first hat what is the price of the more expensive at round to the nearest hundredth
Answers: 1
question
Mathematics, 22.06.2019 00:30
If the perimeter of the square equals the perimeter of the regular pentagon. each side of a pentagon is 16cm long. how long is each side of the square?
Answers: 3
You know the right answer?
A given project’s expected duration along its critical path is 50 days, based on optimistic, most li...
Questions
question
Mathematics, 18.10.2019 14:10
Questions on the website: 13722360