subject
Mathematics, 02.04.2020 22:29 kadeWayne

A construction worker needs 3 2/3 pounds of concrete mix. He has 1 1/2 pounds of concrete mix in one bag, and he has 3 1/0 pound of concrete mix in another bag.

How many more pounds of concrete mix does the construction worker need?

Enter your answer as a mixed number in simplest form by filling in the boxes.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
Apolynomial function has a root of –6 with multiplicity 1, a root of –2 with multiplicity 3, a root of 0 with multiplicity 2, and a root of 4 with multiplicity 3. if the function has a positive leading coefficient and is of odd degree, which statement about the graph is true?
Answers: 2
question
Mathematics, 21.06.2019 19:30
In need of in the diagram, ∠abc is a right angle. ∠dbc = 30°27'40". find the measure of ∠abd.
Answers: 1
question
Mathematics, 21.06.2019 22:00
If the altitude is drawn to the hypotenuse of a right triangle, then the two triangles formed are similar to the original triangle and to each other. which set of triangles shows the similar triangles created by the altitude in the diagram?
Answers: 3
question
Mathematics, 21.06.2019 22:00
Serena is making an experiment. for that, she needs 20 grams of a 52% solution of salt. she has two large bottles of salt water: one with 40% and the other with 70% of salt in them. how much of each must she use to make the solution she needs? i am in need of
Answers: 1
You know the right answer?
A construction worker needs 3 2/3 pounds of concrete mix. He has 1 1/2 pounds of concrete mix in one...
Questions
question
Mathematics, 03.03.2021 22:00
question
Mathematics, 03.03.2021 22:00
question
Mathematics, 03.03.2021 22:00
question
Mathematics, 03.03.2021 22:00
Questions on the website: 13722363