subject
Mathematics, 26.01.2020 17:31 zitterkoph

The cost, c, to produce b baseball bats per day is modeled by the function c(b) = 0.06b2 – 7.2b + 390. what number of bats should be produced to keep costs at a minimum?

a. 27 bats
b. 60 bats
c. 174 bats
d. 390 bats

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
Ineed with number 17 i don’t get it at alll
Answers: 3
question
Mathematics, 21.06.2019 17:00
Jasmine wants to eat at 8: 00pm her meal takes 65mins to cook what time does she need to put the meal in the oven
Answers: 2
question
Mathematics, 21.06.2019 22:00
  cassidy wants to cut the yellow fabric into strips that are 0.3 yards wide. how many strips of yellow fabric can cassidy make? yellow fabric 16 yards for $108.00.
Answers: 1
question
Mathematics, 21.06.2019 23:00
Solve for n. round to the tenths place, if necessary. 14.2 cups of flour6 loaves of bread= 20 cups of flour n
Answers: 2
You know the right answer?
The cost, c, to produce b baseball bats per day is modeled by the function c(b) = 0.06b2 – 7.2b + 39...
Questions
question
Mathematics, 11.05.2021 15:50
question
Physics, 11.05.2021 15:50
question
Mathematics, 11.05.2021 15:50
Questions on the website: 13722360