subject
Mathematics, 14.04.2020 18:13 catboy7196

A cabinet shop produces two types of cabinets: standard and deluxe. A standard cabinet requires 2 man-hours for assembly and 3 man-hours for finishing. A deluxe cabinet requires 3 man-hours for assembly and 4 man-hours for finishing. The shop foreman has 19 man-hours per day available for assembly and 27 man-hours per day for finishing. How many of each type of cabinet can be produced per day

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 22:40
Aclassmate thinks that solving a system by graphing gives an exact answer when the lines appear to cross at a grid point, but only an approximate answer when they don't. explain why this isn't true.
Answers: 3
question
Mathematics, 22.06.2019 01:30
Use the squared identities to simplify sin^2x cos^2x
Answers: 3
question
Mathematics, 22.06.2019 03:00
In a city, 6th and 7th avenues are parallel and the corner that the pizza palace is on is a 54° angle. what is the measure of the angle that is made with 7th ave and broadway on the corner of the shake hut?
Answers: 2
question
Mathematics, 22.06.2019 03:30
*15 pts* the graph of an exponential function of the form y = f(x) = ax passes through the points and the graph lies the x-axis. first line choices: (0, a) (0, 1) (0, 2) (0, -1) second line choices: (1, 0) (1, a) (1, 1) (1, -2) third line choices: above below on the
Answers: 1
You know the right answer?
A cabinet shop produces two types of cabinets: standard and deluxe. A standard cabinet requires 2 ma...
Questions
question
Chemistry, 16.06.2021 03:00
question
Chemistry, 16.06.2021 03:00
question
Mathematics, 16.06.2021 03:00
question
Mathematics, 16.06.2021 03:00
question
Mathematics, 16.06.2021 03:00
question
Mathematics, 16.06.2021 03:00
Questions on the website: 13722361