subject
Mathematics, 15.04.2020 17:22 SavageKidKobe

A new process for producing a type of resin is supposed to have a mean cycle time of 3.5 hours per batch. Six batches are produced, and their cycle times, in hours, were: 3.45, 3.47, 3.57, 3.52, 3.40, and 3.63. You decided to conduct a hypothesis test to determine whether the mean cycle time is greater than 3.5 hours.

a. Use the critical value approach.
b. Use the p-value approach

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
Which function has the smallest y-intercept value
Answers: 2
question
Mathematics, 21.06.2019 14:20
If sin θ=24/25 and 0 less than or equal to θ less than or equal to π/2, find the exact value of tan 2θ. answers; a) -527/336 b) -336/527 c)7/24 d) 24/7
Answers: 3
question
Mathematics, 21.06.2019 22:00
Asquare and an equilateral triangle have the same perimeter. each side the triangle is 4 inches longer than each side of the square. what is the perimeter of the square
Answers: 1
question
Mathematics, 22.06.2019 01:00
Determine the intercepts of the line that passes through the following points. (15,-3)(15,−3) (20,-5)(20,−5) (25,-7)(25,−7)
Answers: 1
You know the right answer?
A new process for producing a type of resin is supposed to have a mean cycle time of 3.5 hours per b...
Questions
question
Mathematics, 15.10.2020 18:01
question
English, 15.10.2020 18:01
Questions on the website: 13722360