subject
Mathematics, 15.04.2020 21:44 Superfamicom7748

A mixing drum at Salvador’s, construction company mixes the highest quality concrete on the east coast. This mixing drum is available 18 hours a day. It produces about 10 pounds of concrete a day. As this construction company makes several kinds of concrete a day, they have to stop the machine and change over to a new type of concrete a few times a day. Each pound of concrete takes about 60 minutes to produce. Within this 60 minutes, 50 minutes are actual production and 10 minutes are allocated to set up the machine. Find the Overall Equipment Effectiveness of this mixing drum (round to the 2nd decimal place). Round to the nearest %

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 23:00
Spencer has 1/3 pound of nuts he divides them equally into 4 bags what fraction of a pound of nuts is in each bag
Answers: 1
question
Mathematics, 22.06.2019 01:00
Asandwich shop has 18 tables. each table seats up to 4 people. to find the greatest number of people that can be seated, you can solve p4 ≤ 18. which step is the best way to solve the inequality? plz asap i repeat plz
Answers: 2
question
Mathematics, 22.06.2019 03:30
The height above the ground (in feet) of a ball dropped from the top of a 30-foot-tall building after t seconds is given by the polynomial: ? 16t^2+30 what is the height of the ball after 1/2 second?
Answers: 3
question
Mathematics, 22.06.2019 05:10
What is the value of g(8) for the function g(x) in part c? what does this value mean in the context of the situation you described in part c?
Answers: 1
You know the right answer?
A mixing drum at Salvador’s, construction company mixes the highest quality concrete on the east coa...
Questions
question
Mathematics, 20.07.2019 11:00
question
Mathematics, 20.07.2019 11:00
Questions on the website: 13722367