A manufacturing firm produces two products. These products generate profits of $140 and $70 per unit respectively. Each product must go through an assembly process and a finishing process. Product 1 takes 5 hours per unit to assemble and 10 hours per unit to finish. While product 2 takes 10 hours to assemble and 6 hours to finish per unit. The firm has 80 assembly hours and 90 finishing hours available. The products are then transferred to a warehouse, which has space for a total of 20 units to store. How much each product be produced to maximize total profit?

1. The manufacturing firm can get maximum profit of:
2. The optimal solution occurs at:
3. The binding constraints are:
4. The redundant constraints are:
5. if objective function is changed to 20 X1+ 40 X2, the optimal solution will be:

a. same as found earlier
b. at multiple points (alternate optimum)
c. at one point but different than found earlier
d. cannot be determined

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
One integer is 8 times another. if the product is 72, then find the integers
Answers: 2
question
Mathematics, 21.06.2019 17:30
What is the base of 1/9 to the power of 2
Answers: 1
question
Mathematics, 21.06.2019 18:30
What is the answer to this question? i'm a bit stumped. also how do i do it? 5(x - 4) = 2(x + 5)
Answers: 1
question
Mathematics, 21.06.2019 19:50
Examine the two-step equation. βˆ’ 7 4 + x 4 = 2 which property of operations allows you to add the same constant term to both sides? amultiplication property of equality bdivision property of equality caddition property of equality dsubtraction property of equality
Answers: 2
You know the right answer?
A manufacturing firm produces two products. These products generate profits of $140 and $70 per unit...
Questions
question
Mathematics, 12.05.2021 01:00
question
Mathematics, 12.05.2021 01:00
Questions on the website: 13722360