subject
Mathematics, 22.04.2020 03:12 CoolRahim9090

A major manufacturing firm producing PCB for electrical insulation discharges small amounts from the plant. We assume that the amount of PCB discharge per water specimen is normally distributed with known standard deviation . Production will be halted if there is evidence that the mean PCB amount discharged in the water exceeds 3 ppm (parts per million). A random sample of 16 water specimens produced ppm. a) Do these statistics provide sufficient evidence to halt the process? Use . b) Briefly discuss the consequences of type I and type II errors. From your point of view, which of the two errors is the most serious? c) Construct a 99% confidence interval for the true mean PCB amount discharged in the water.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
In a probability experiment, karen flipped a coin 76 times. the coin landed on heads 32 times. what percentage of the coin flips resulted in tails? round to the nearest percent. a. 58% b. 65% c. 42% d. 60%
Answers: 2
question
Mathematics, 21.06.2019 18:20
Match each inequality to the number line that represents its solution
Answers: 3
question
Mathematics, 21.06.2019 19:00
How many solutions does the nonlinear system of equations graphed bellow have?
Answers: 1
question
Mathematics, 21.06.2019 19:30
:24% of students in a class are girls. if there are less than 30 students in this class, how many students are there? how many girls are there?
Answers: 2
You know the right answer?
A major manufacturing firm producing PCB for electrical insulation discharges small amounts from the...
Questions
question
Mathematics, 18.11.2020 06:10
question
Mathematics, 18.11.2020 06:10
question
Mathematics, 18.11.2020 06:10
Questions on the website: 13722363