subject
Mathematics, 25.04.2020 04:21 Milanchik28

A manufacturing process is designed to produce bolts with a 0.25-in. diameter. Once each day, a random sample of 36 bolts is selected and the diameters recorded. If the resulting sample mean is less than 0.230 in. or greater than 0.270 in., the process is shut down for adjustment. The standard deviation for diameter is 0.04 in. What is the probability that the manufacturing line will be shut down unnecessarily

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
What is the result of converting 60 ounces to pounds remember there are 16 ounces in a pound
Answers: 2
question
Mathematics, 22.06.2019 00:20
Biggest exam of the which of the following are polynomial functions?
Answers: 1
question
Mathematics, 22.06.2019 01:00
Find the average rate of change for the given function drom x=1 to x=2
Answers: 1
question
Mathematics, 22.06.2019 02:00
Grant simplified the expression 1.5(-3.2 + 2.5) his work is shown below explain the error in grants work
Answers: 1
You know the right answer?
A manufacturing process is designed to produce bolts with a 0.25-in. diameter. Once each day, a rand...
Questions
question
Mathematics, 17.08.2021 01:20
question
English, 17.08.2021 01:30
question
Mathematics, 17.08.2021 01:30
question
Mathematics, 17.08.2021 01:30
Questions on the website: 13722363