subject
Mathematics, 06.05.2020 02:17 iiheartshay

We are continuing to study the difference in average time for completion for the two matching schemes. However, this time we had 30 individuals participate. The shapes and cutouts are all the same color (treatment s) The shapes and cutouts are different colors (treatment d) For each participant, the treatment s - treatment d was found. The 95% CI was (-4.617, -9.383). Complete the interpretation statement. "We are 95% confident that the time to completion for the same color method is between 4.617 to 9.383 than the different color method."

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:40
Evaluate the following expression 1/3^2
Answers: 1
question
Mathematics, 21.06.2019 15:50
Arectangle has a width of 9 units and length of 40 units. what is the length of a diognal. a. 31 unitsb. 39 unitsc. 41 units d. 49 units
Answers: 1
question
Mathematics, 21.06.2019 19:50
Use composition to determine if (x) or h(x) is the inverse of f(x) for the limited domain x2-1.
Answers: 3
question
Mathematics, 21.06.2019 20:00
Someone answer asap for ! the boiling point of water at an elevation of 0 feet is 212 degrees fahrenheit (°f). for every 1,000 feet of increase in elevation, the boiling point of water decreases by about 2°f. which of the following represents this relationship if b is the boiling point of water at an elevation of e thousand feet? a. e = 2b - 212 b. b = 2e - 212 c. e = -2b + 212 d. b = -2e + 212
Answers: 1
You know the right answer?
We are continuing to study the difference in average time for completion for the two matching scheme...
Questions
question
Mathematics, 29.08.2020 23:01
Questions on the website: 13722359