A control chart is used to control the fraction nonconforming based on three-sigma control limits. The average of this process is 0.05 and the sample size is 400. (a) (6 pts) What are the upper and lower control limits? (b) (7 pts) If the process average shift to 0.15, what is the probability that the shift would be detected on the first subsequent sample? (c) (6 pts) What is the probability that the shift would be detected on exactly the third sample?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Solve the problem. a student earned grades of c, a, b, and a in four different courses. those courses had these corresponding numbers of credit hours: 4, 5, 1, and 5. the grading system assigns quality points to letter grades as follows: a = 4, b = 3, c = 2, d = 1, and f = 0. compute the grade point average (gpa) and round the result to two decimal places. 3.40 3.50 8.75 2.18
Answers: 1
question
Mathematics, 21.06.2019 20:30
The sum of these consecutive integers is equal to 9 less than 4 times the least of the integer. find the three integers
Answers: 1
question
Mathematics, 21.06.2019 21:00
Mr. thompson is on a diet. he currently weighs 260 pounds. he loses 4 pounds per month. what part of the story makes the relationship not proportional?
Answers: 3
question
Mathematics, 21.06.2019 22:00
Given that sinβˆ… = 1/4, 0 < βˆ… < Ο€/2, what is the exact value of cosβˆ…? a. (√4)/4 b. (√15)/4 c. (4Ο€)/2 d. (4√2)/4
Answers: 2
You know the right answer?
A control chart is used to control the fraction nonconforming based on three-sigma control limits. T...
Questions
Questions on the website: 13722363