A welder produces 7 welded assemblies during the first day on a new job, and the seventh assembly takes 45 min (unit time). The worker produces 10 welded assemblies on the second day, and the 10th assembly on the second day takes 30 min. Given this information, (a) what is the learning rate percentage and (b) what is the total cumulative time to produce all 17 welded assemblies

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Solve the x in the equation x^2+14x+17=-96
Answers: 1
question
Mathematics, 21.06.2019 18:40
Juliana says that she can use the patterns of equivalent ratios in the multiplication table below to write an infinite number of ratios that are equivalent to 6: 10. which statement explains whether juliana is correct? she is correct because she can multiply 6 and 10 by any number to form an equivalent ratio. she is correct because 6: 10 can be written as 1: 2 and there are an infinite number of ratios for 1: 2. she is not correct because the multiplication table does not include multiples of 10. she is not correct because 6: 10 is equivalent to 3: 5 and there are only 9 ratios in the multiplication table that are equivalent to 3: 5.
Answers: 1
question
Mathematics, 21.06.2019 19:00
Iwill give you ! what is the measure of ∠v ?
Answers: 2
question
Mathematics, 21.06.2019 19:00
In trapezoid abcd, ac is a diagonal and ∠abc≅∠acd. find ac if the lengths of the bases bc and ad are 12m and 27m respectively.
Answers: 3
You know the right answer?
A welder produces 7 welded assemblies during the first day on a new job, and the seventh assembly ta...
Questions
question
Engineering, 20.12.2020 05:30
question
Mathematics, 20.12.2020 05:30
question
Mathematics, 20.12.2020 05:30
question
Mathematics, 20.12.2020 05:30
question
Mathematics, 20.12.2020 05:30
Questions on the website: 13722363