subject
Mathematics, 05.05.2020 17:37 lilytimpsonx

A national organization has been working with utilities throughout the nation to find sites for large wind machines that generate electricity. Wind speeds must average more than 16 miles per hour (mph) for a site to be acceptable. Recently, the organization conducted wind speed tests at a particular site. To determine whether the site meets the organization's requirements, consider the test, Upper H 0 : mu equals 16 vs. Upper H Subscript a Baseline : mu greater than 16 comma nbspwhere mu is the true mean wind speed at the site and alpha equals 0.10 . Suppose the observed significance level (p-value) of the test is calculated to be p equals 0.2995 . Interpret this result.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
X2 + y 2 = 36 x + y = 6 solve the system of equations.
Answers: 3
question
Mathematics, 21.06.2019 22:00
Type the correct answer in the box. consider the system of linear equations below. rewrite one of the two equations above in the form ax + by = c, where a, b, and c are constants, so that the sum of the new equation and the unchanged equation from the original system results in an equation in one variable.
Answers: 2
question
Mathematics, 21.06.2019 22:00
Asales representative from a local radio station is trying to convince the owner of a small fitness club to advertise on her station. the representative says that if the owner begins advertising on the station today, the club's total number of members will grow exponentially each month. she uses the given expression to model the number of club members, in hundreds, after advertising for t months.
Answers: 2
question
Mathematics, 21.06.2019 22:30
Gabrielle's age is two times mikhail's age. the sum of their ages is 84. what is mikhail's age?
Answers: 2
You know the right answer?
A national organization has been working with utilities throughout the nation to find sites for larg...
Questions
Questions on the website: 13722363