subject
Mathematics, 05.05.2020 19:33 opreston

A quality control engineer at a potato chip company tests the bag filling machine by weighing bags of potato chips. Not every bag contains exactly the same weight. But if more than 15% of bags are over-filled then they stop production to fix the machine. They define over-filled to be more than 1 ounce above the weight on the package. The engineer weighs 100 bags and finds that 21 of them are over-filled. He plans to test the hypotheses H 0: p = 0.15 versus H a : p > 0.15. What is the test statistic?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Plz a. s. a. p.the table shows the number of male and female contestants who did not win a prize. what is the probability that a randomly selected contestant won a prize, given that the contestant was female? write the probability as a percent. round to the neares tenth, if needed.
Answers: 1
question
Mathematics, 21.06.2019 19:30
In the given triangle, ∠aed ∼ ∠ abc, ad = 6.9, ae = 7.2, de = 5.2, and bc = 10.2. find the measure of bd and ce. round your answer to the nearest tenth.
Answers: 2
question
Mathematics, 21.06.2019 20:00
What are the domain and range of the function f(x)=2^x+1
Answers: 1
question
Mathematics, 21.06.2019 21:00
Finding tbe values of the variables in each kite
Answers: 1
You know the right answer?
A quality control engineer at a potato chip company tests the bag filling machine by weighing bags o...
Questions
question
Mathematics, 24.04.2020 20:27
question
Mathematics, 24.04.2020 20:27
question
Mathematics, 24.04.2020 20:27
Questions on the website: 13722367