In a company, it takes 4 employees 4 days to complete a
task. It would take 2 employees 8 days...
Mathematics, 05.05.2020 21:40 ryndersava
In a company, it takes 4 employees 4 days to complete a
task. It would take 2 employees 8 days to complete the
same task
Which function can be used to represente, the number of
employees working on the task, and the number of days
takes them to complete that task?
direct variations duke
direct variation; de k
inverse variation; ke
inverse variation; de k
Mark this and retum
Answers: 2
Mathematics, 21.06.2019 16:10
What is the point-slope equation of a line with slope -5 that contains the point (6,3)
Answers: 1
Mathematics, 21.06.2019 20:30
The number of 8th graders who responded to a poll of 6th grade and 8 th graders was one fourtg of the number of 6th graders whi responded if a total of 100 students responddd to the poll how many of the students responded were 6 th graders
Answers: 1
Mathematics, 21.06.2019 20:40
Describe the symmetry of the figure. identify lines of symmetry, if any. find the angle and the order of any rotational symmetry.
Answers: 1
Mathematics, 21.06.2019 20:50
The first side of a triangle measures 5 in less than the second side, the third side is 3 in more than the first side, and the perimeter is 17 in. how long is the third side? if s represents the length of the second side, which of the following represents the length of the third side? s-5 ws-2 s+ 3 next question ask for turn it in
Answers: 1
Advanced Placement (AP), 13.06.2020 05:57
Mathematics, 13.06.2020 05:57
English, 13.06.2020 05:57
Mathematics, 13.06.2020 05:57
Mathematics, 13.06.2020 05:57
Mathematics, 13.06.2020 05:57
Mathematics, 13.06.2020 05:57