subject
Mathematics, 19.05.2020 17:03 tcarston1728

A group of engineers developed a new design for a steel cable. They need to estimate the amount of weight the cable can hold. The weight limit will be reported on cable packaging. The engineers take a random sample of 45 cables and apply weights to each of them until they break. The mean breaking weight for the 45 cables is 768.2 lb. The standard deviation of the breaking weight for the sample is 15.1 lb. Using the sample information as given, construct a confidence interval for the mean breaking strength of the new steel cable.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 22:30
Which description is represented by a discrete graph? kiley bought a platter for $19 and several matching bowls that were $8 each. what is the total cost before tax? the temperature at 9 a.m. was 83° f and is heating up at an average rate of 6°f per hour. what is the temperature x hours later? juan ate an egg with 78 calories and some cereal with 110 calories per serving for breakfast. what is the total amount of calories he consumed? a bottle contained 2,000 ml of liquid and is being poured out at an average rate of 300 ml per second. how much liquid is left in the bottle after x seconds?
Answers: 3
question
Mathematics, 21.06.2019 23:40
Cos^2x+cos^2(120°+x)+cos^2(120°-x)i need this asap. pls me
Answers: 1
question
Mathematics, 22.06.2019 00:20
❤️ (geometry) does the construction demonstrate how to copy an angle correctly using technology a) yes; the distance between points a and f was used to create circle h b) yes; the distance between points f and g was used to create circle h c)no; the distance between points a and f was used to create circle h d) no; the distance between points f and g was used to create circle h
Answers: 2
question
Mathematics, 22.06.2019 02:20
Which of these could you find on a credit report? check all that apply. previous address current employer highest level of education completed bankruptcy and a civil court case monthly income late credit card payments
Answers: 2
You know the right answer?
A group of engineers developed a new design for a steel cable. They need to estimate the amount of w...
Questions
Questions on the website: 13722367