subject
Mathematics, 21.05.2020 21:04 jewlbug4358

The overall project risk factor is known to be 0.5. The probability of dependency failure is twice the probability of complexity failure and four times the probability of maturity failure. The consequence of performance failure is twice the consequence of reliability failure, four times the consequence of schedule failure and eight times the consequence of cost failure. What is the difference between the probability of maturity failure and the consequence of cost failure

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Consider the reaction 2x2y2+z2⇌2x2y2z which has a rate law of rate= k[x2y2][z2] select a possible mechanism for the reaction.
Answers: 2
question
Mathematics, 21.06.2019 19:00
Pyotr tchaikovsky sporting goods operates on a 45% overhead based on the selling price, which results in an overhead of $65.34 on the newest version of an air hockey game set. if the air hockey game set costs pyotr tchaikovsky sports $49.32, find the selling price, the markup, and the net profit.
Answers: 2
question
Mathematics, 21.06.2019 19:00
The annual snowfall in a town has a mean of 38 inches and a standard deviation of 10 inches. last year there were 63 inches of snow. find the number of standard deviations from the mean that is, rounded to two decimal places. 0.44 standard deviations below the mean 2.50 standard deviations below the mean 0.44 standard deviations above the mean 2.50 standard deviations above the mean
Answers: 3
question
Mathematics, 21.06.2019 19:30
Now max recorded the heights of 500 male humans. he found that the heights were normally distributed around a mean of 177 centimeters. which statements about max’s data must be true? a) the median of max’s data is 250 b) more than half of the data points max recorded were 177 centimeters. c) a data point chosen at random is as likely to be above the mean as it is to be below the mean. d) every height within three standard deviations of the mean is equally likely to be chosen if a data point is selected at random.
Answers: 1
You know the right answer?
The overall project risk factor is known to be 0.5. The probability of dependency failure is twice t...
Questions
question
Social Studies, 28.07.2019 11:00
Questions on the website: 13722360