The manufacturer wishes to set up a control chart at the final inspection station for a gas water heater. Defects in workmanship and visual quality features are checked in this inspection. For the past 22 working days, 176 water heaters were inspected and a total of 924 nonconformities reported.

(a) What type of control chart would you recommend here, and how would you use it?

(b) Using two water heaters as the inspection unit, calculate the center line and control limits that are consistent with the past 22 days of inspection data.

(c) What is the probability of type I error for the control chart in part (b)?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
Asap 25 pts brainliest to right best/answer
Answers: 2
question
Mathematics, 21.06.2019 14:30
Which statement about the relative areas of ? abc and ? xyz is true? the area of ? abc > the area of ? xyz the area of ? abc < the area of ? xyz the area of ? abc = the area of ? xyz more information is needed to compare.
Answers: 2
question
Mathematics, 21.06.2019 18:20
The first-serve percentage of a tennis player in a match is normally distributed with a standard deviation of 4.3%. if a sample of 15 random matches of the player is taken, the mean first-serve percentage is found to be 26.4%. what is the margin of error of the sample mean? a. 0.086% b. 0.533% c. 1.11% d. 2.22%
Answers: 1
question
Mathematics, 21.06.2019 18:30
Which equation represents the model shown? a)1/3 divide 1/6 = 2 b)2/3 divide 1/6 = 2/18 c)1/3 divide 1/6 = 1/18 d)2/3 divide 1/6 =4
Answers: 1
You know the right answer?
The manufacturer wishes to set up a control chart at the final inspection station for a gas water he...
Questions
question
Mathematics, 24.09.2020 09:01
question
Mathematics, 24.09.2020 09:01
question
Advanced Placement (AP), 24.09.2020 09:01
question
Mathematics, 24.09.2020 09:01
Questions on the website: 13722361