Mathematics, 26.05.2020 00:57 linz6227
The variable costs associated with a certain process are GHS0.65 per item. The fixed costs per day have been calculated as GHS250 with special costs estimated as GHS0.02, where Q is the output level produced ( i, e, the number of items produced ).
a. Derive the average cost of production function
b. Calculate the output level at which average cost is minimised
c. Calculate the average cost of production
d. What limitation is placed on Q?
Answers: 1
Mathematics, 21.06.2019 23:30
Is the underlined participial phrase correctly placed or misplaced? i smelled each and every flower strolling through the garden. a. correctly placed participial phrase b. misplaced participial phrase
Answers: 2
Mathematics, 22.06.2019 00:10
Given: p: 2x = 16 q: 3x β 4= 20 which is the converse of p - q? if 2x + 16, then 3x - 4 20. if 3x β4 +20, then 2x # 16. lf 2x = 16, then 3x - 4 = 20. lf 3x β 4= 20, then 2x = 16. o o
Answers: 1
Mathematics, 22.06.2019 01:00
Libby built a fence that was 56 \text { feet}56 feet long over 44 days. she built the same length of fence each day. how many inches of fence did libby build each day?
Answers: 1
The variable costs associated with a certain process are GHS0.65 per item. The fixed costs per day h...
Mathematics, 10.04.2021 07:00
Mathematics, 10.04.2021 07:00
Mathematics, 10.04.2021 07:00
History, 10.04.2021 07:00
Mathematics, 10.04.2021 07:00
Mathematics, 10.04.2021 07:00
Mathematics, 10.04.2021 07:00
English, 10.04.2021 07:00
Social Studies, 10.04.2021 07:00
Mathematics, 10.04.2021 07:00
Mathematics, 10.04.2021 07:00
Mathematics, 10.04.2021 07:00