subject
Mathematics, 25.05.2020 11:58 lilly4920

On Monday, it took 5 builders 3 in a half hours to build a wall.
An identical wall needs to be built on Tuesday but only 2 builders are available.

Each builder is paid £9.30 for each hour or part of an hour they work.
Work out how much each builder will be paid
for the work completed on Tuesday.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
Rockwell hardness of pins of a certain type is known to have a mean value of 50 and a standard deviation of 1.1. (round your answers to four decimal places.) (a) if the distribution is normal, what is the probability that the sample mean hardness for a random sample of 8 pins is at least 51?
Answers: 3
question
Mathematics, 21.06.2019 17:40
Aline has a slope of and a y-intercept of –2. what is the x-intercept of the line?
Answers: 1
question
Mathematics, 21.06.2019 20:30
Someone answer asap for ! michele pushes a box d meters across a floor. she uses a force f, in newtons, to push the box. she pushes the box for t seconds. the formula p = fd/t calculates the power, p, in watts, that it takes for michele to complete the task. solve the formula for d.
Answers: 2
question
Mathematics, 21.06.2019 20:30
What is 1/3x5 on anuber line what does it look like on a number line
Answers: 3
You know the right answer?
On Monday, it took 5 builders 3 in a half hours to build a wall.
An identical wall needs to be...
Questions
question
Mathematics, 15.04.2020 19:25
Questions on the website: 13722360