Mathematics, 05.06.2020 18:02 aramirez4785
At a furniture manufacturer, worker A can assemble a shelving unit in 5 hours. Worker B can assemble the same shelving unit in 3 hours. Which equation can be used to find t, the time in hours it takes for worker A and worker B to assemble a shelving unit together?
Rate
(Shelving Units per Hour)
Time
(Hours)
Fraction Completed
Worker A
One-fifth
t
Worker B
One-third
t
5 t + 3 t = 1
One-fifth t minus one-third t = 1
One-fifth t + one-third t = 1
5 t minus 3 5 = 1
Answers: 3
Mathematics, 21.06.2019 19:00
1c) the number 131 is a term in the sequence defined by the explicit rule f(n)=5n-4. which term in the sequence is 131? 2a) write the first four terms of the function f(n)=n^2-1 2b) what is the 10th term of the sequence defined by the explicit rule f(n)=n^2-1 2c) the number 224 is a term in the sequence defined by the explicit rule f(n)=n^2-1. which term in the sequence is 224?
Answers: 2
Mathematics, 21.06.2019 20:00
Someone answer asap for ! the boiling point of water at an elevation of 0 feet is 212 degrees fahrenheit (°f). for every 1,000 feet of increase in elevation, the boiling point of water decreases by about 2°f. which of the following represents this relationship if b is the boiling point of water at an elevation of e thousand feet? a. e = 2b - 212 b. b = 2e - 212 c. e = -2b + 212 d. b = -2e + 212
Answers: 1
Mathematics, 21.06.2019 21:00
Consider the polynomials given below. p(x) = x4 + 3x3 + 2x2 – x + 2 q(x) = (x3 + 2x2 + 3)(x2 – 2) determine the operation that results in the simplified expression below. 35 + x4 – 573 - 3x2 + x - 8 a. p+q b. pq c.q-p d. p-q
Answers: 2
At a furniture manufacturer, worker A can assemble a shelving unit in 5 hours. Worker B can assemble...
Computers and Technology, 19.12.2020 21:00
Social Studies, 19.12.2020 21:00
Arts, 19.12.2020 21:00
English, 19.12.2020 21:00
Arts, 19.12.2020 21:00
Spanish, 19.12.2020 21:00
English, 19.12.2020 21:00
English, 19.12.2020 21:00
English, 19.12.2020 21:00